Construction General Permit Requirements & Solutions
Requirements (Incl. Increased Requirements) See Solutions »
- Risk Level assessment for all project sites disturbing 1 acre or more
- Increasing SWPPP requirements based on Risk Level
- Web‐based real‐time expanded SWPPP reporting requirements through the Stormwater Multiple Applications and Report Tracking System (SMARTS)
- Preparation of Rain Event Action Plans (REAP) for all Risk Level 2 and 3 sites
- Stormwater runoff must be tested and meet established numeric limits
- Numeric Effluent Level (NEL)
- Numeric Action Level (NAL)
- Preparation of annual reports through SMARTS
- Required SWPPP certifications:
- Qualified SWPPP Developer (QSD)
- Qualified SWPPP Practitioner (QSP)
Solutions
ADH Construction General Permit Solutions
- QSD SWPPP development and project coordination
- QSP implementation, inspections and BMP evaluations
- SMART system data entry
- Submittal of Project Reporting Documents (PRDs) and data submittal for Legally Responsible Party (LRP) certification through the SMARTS system
- Construction site management assistance
- On‐site and workshop SWPPP compliance training
- Rain Event Action Plans (REAP)
- Rain event and periodic compliance inspections
- Stormwater runoff sampling and analysis
- Receiving water sampling planning, development, and implementation
- Stormwater Effluent Numeric Action Level (NEL) and
- Numeric Effluent Level (NEL) guidance
- Home
- About
- Services
- Projects
- Stormwater and Surface Water Quality
- ACCWP Stormwater, Bioassessment, Instrumentation
- CCCWP Stormwater, Bioassessment, Instrumentation
- Clean Watersheds for a Clean Bay
- CalTrans SFOBB
- City of Trinidad - Storm Water Management Improvement Project
- Caltrans Willits
- CalTrans Storm Drain Inventory
- CalTrans LTDC
- CalTrans OGAPP
- Caltrans ORVTS
- CalTrans ASBS
- Gentry-Suisun Water Quality
- Summit Lake
- Santa Cruz Storm Water
- FedEx Storm Water
- Areas of Special Biological Significance Reference Stream Receiving Water Monitoring and Data Management
- Stormwater BMP Compliance
- Erosion & Sediment Control
- Coastal Oceanography and Sediment Sampling
- Pinole Shoal Channel Sediment Characterization 2010
- Pinole Shoal Channel Sediment Characterization 2009
- Crescent City Sediment Characterization
- Marina Sediment Transport Modeling
- Suisin Bay and New York Slough Sediment Characterization
- Humboldt Harbor Channel USACE
- Noyo River USACE
- Trinidad Rancheria
- Devil's Slide Dilution
- West Basin Coring
- Pier 27 Coring
- Pier 35 Coring
- Miscellaneous
- Stormwater and Surface Water Quality
- Clients
- Links
- Contact