ADH Client Project Name Status Work Performed
MACTEC Engineering and Consulting, Inc. (MACTEC) Caltrans Storm Water Quality Monitoring Program - San Francisco-Oakland Bay Bridge Bioretention Pilot Project (SFOBB) Ongoing since December 2008
  • Install, maintain and operate remote storm water monitoring stations
  • Remote data communication and instrument control
  • Sample collection
  • Tidal monitoring
  • Fish monitoring in storm drain system
  • Operation and troubleshooting of storm water lift stations
Brown and Caldwell CalTrans Storm Water Quality Monitoring Program Phase II Storm Drain System Inventory Ongoing since June 2008
  • Identify discharge points, outfalls, BMPs, etc. along designated highways
  • Use variety of data sources for additional verification
  • Establish terminal discharge areas
  • Use Arcmap to enter, store, and manage collected data
MACTEC Engineering and Consulting, Inc. (MACTEC) Caltrans Storm Water Quality Study - Long-term Discharge Characterization (LTDC) Ongoing since November 2007
  • Install, Maintain and Operate Remote Storm Water Monitoring Station (Camp Roberts)
  • Meterological Forecasating
  • Field Documentation
  • Quality Assurance/Quality Control
MACTEC Engineering and Consulting, Inc. (MACTEC) Caltrans Storm Water Quality Study - Investigation of Porous Asphalt Concrete Overlays (OGAPP) Ongoing since February 2007
  • Site Selection
  • Maintain and Operate Remote Storm Water Monitoring Stations
  • Meterological Forecasting
  • Field Documentation
  • Quality Assurance/Quality Control
MACTEC Engineering and Consulting, Inc. (MACTEC) Caltrans Districts 1, 4 & 5 Discharges to Areas of Special Biological Significance (ASBS) Storm Water Quality Monitoring Program Ongoing since February 2006
  • Site Selection
  • Prepare Site Selection Technical Memoranda
  • Prepare Sampling and Analysis Plan
  • Prepare Health and Safety Plan
  • Install, Maintain and Operate Remote Storm Water Monitoring Stations
  • Ocean Receiving Waters Sampling
  • Stream Rating and Monitoring
  • Meteorological Forcasting
  • Prepare Post-Storm Technical Memoranda
  • Prepare Annual Monitoring Report
  • Participate on Expert Advisory Panels
  • Agency Permitting
  • Quality Assurance/Quality Control
Trumark Companies Baseline Water Quality Monitoring Program, Gentry-Suisun Land Development Project Site February - June 2007
  • Conducted water quality sampling of two water bodies that flow through project site
  • Reviewed available data about water quality conditions upstream of the site
Brown and Caldwell Storm Water Sampling Assistance Services, Federal Express Corporation October 2005 - October 2006
  • Storm Tracking
  • Onsite Storm Water Monitoring
  • Sample Collection
  • Generation Of Field Reports
  • Sample Handling
Summit Lake Paiute Tribe Water Quality Monitoring and Capacity Building Training June 2003 - August 2006
  • Semi-Annual Stream, Lake and Groundwater Sampling
  • Prepare Monitoring Reports
  • Prepare Training Manual
  • Regulatory Agency Interaction
  • Client Training
E2 Consulting Engineers Storm Water Inflow and Infiltration Study for the City of Santa Cruz Completed July 2006
  • Assisting In Equipment Installation, Monitoring, Data Acquisition, And Demobilization
  • Participated In Confined Space Entry Necessary For Gaining Access To The Monitoring Points

For further details, please click on the menu items at top left.

 