|
ADH Client
|
Project Name
|
Status
|
Work Performed
|
|
California Department of Transportation
|
Caltrans District 4 Devil's Slide Tunnel Project Engineering Inpection Services
|
February 2008 - Present
|
- Preparation of a comprehensive checklist for operations requiring inspection
- Inspection of storm water controls
- Evaluation of water treatment systems
- Monitoring shotcrete usage to determine conformance with regulatory conditions
- Weekly and monthly summary reporting
- Collaboration on annual reporting
|
|
URS Corporation
|
Test Plan for the Temporary Non-vegetative Erosion Control Pilot Study
|
March - April 2007
|
- Developed a Test Plan Technical Memorandum to evaluate the performance of the
non-vegetative temporary soil stabilizers.
|
|
Hanson Aggregates Mid-Pacific
|
Storm Water Polluton Prevention Plan Compliance, Clayton & San Luis Obispo, California
|
Completed December 2004
|
- SWPPP Editorial Review
- Designed and supervised construction of two detention ponds
- Supervised installation of sediment source control features
|
For further details, please click on the menu items at top left.