Erosion and Sediment Control

ADH Client Project Name Status Work Performed
California Department of Transportation Caltrans District 4 Devil's Slide Tunnel Project Engineering Inpection Services February 2008 - Present
  • Preparation of a comprehensive checklist for operations requiring inspection
  • Inspection of storm water controls
  • Evaluation of water treatment systems
  • Monitoring shotcrete usage to determine conformance with regulatory conditions
  • Weekly and monthly summary reporting
  • Collaboration on annual reporting
URS Corporation Test Plan for the Temporary Non-vegetative Erosion Control Pilot Study March - April 2007
  • Developed a Test Plan Technical Memorandum to evaluate the performance of the non-vegetative temporary soil stabilizers.
Hanson Aggregates Mid-Pacific Storm Water Polluton Prevention Plan Compliance, Clayton & San Luis Obispo, California Completed December 2004
  • SWPPP Editorial Review
  • Designed and supervised construction of two detention ponds
  • Supervised installation of sediment source control features

For further details, please click on the menu items at top left.

 
Strategy.  Analysis.  Solutions.