Market Street Bridge Seismic Retrofit & Concrete Barrier Project

Client: Taber Consultants as performed for the City of Santa Cruz

Location: Santa Cruz, California

Project Description: The intent of proposed earthquake retrofit work was to construct soil cement columns to strengthen weak and potentially liquefiable soils behind existing bridge abutments in order to substantially reduce the risk of earthquake induced ground movement sufficient to result in bridge collapse. The soil-cement column elements are expected to resist ground movement in shear, and steel pile inserts were incorporated to provide a high level of assurance of column continuity, strength and "ductility" in shear.

Task: ADH provided observation of installation activities and representative sampling for the construction of 90 30- to 72-inch diameter soil-cement columns to depths up to 50 feet below ground surface for the seismic retrofit and concrete barrier project of Market Street Bridge (No. 26C0088) located in Santa Cruz, California. Observation and reporting procedures were performed in accordance with the requirements specified by Taber Consultants.

Market Street Bridge Market Street Bridge
Market Street Bridge Post-Construction

 
Strategy.  Analysis.  Solutions.