Facility Inspection
Client: International Aluminum Corporation
Prime Contractor: URS Corporation
Location: Facilities in Five States and Two Canadian Provinces
Period of Performance: June, 2007 - Present
Goals: As a subcontractor to URS Corporation, ADH assists International Aluminum Corporation
with the development or updating of Storm Water Pollution Prevention Plans (SWPPPs) for several
door and window manufacturing facilities.
Project Description:
- Perform reviews of existing storm water-related documents for each facility
- Conduct site inspections at each facility
- Evaluate current SWPPPs and BMPs, if existing
- Develop a relevant, up-to-date SWPPP for each facility
Underground Sump
Facility and Regulations Review: Review existing Environmental Site Assessments and
other relevant documentation, as well as perform independent research on applicable
federal/state/provincial storm water-related regulations or guidelines for each facility, including
those for the states of Arizona, California, Illinois, South Carolina, and Texas, and the provinces
of British Columbia and Ontario.
Site Inspections: Conduct site visits at each facility for the following tasks: introductory
guided tours of each facility; independent walk-through inspections and photo documentation at each
facility; thorough evaluations of existing BMPs; identification of additional BMPs requiring
implementation; investigations of potential storm water runoff influences from adjacent properties;
and concise debriefings with facility environmental program directors.
Reporting: Prepare or update site-specific SWPPPs for each facility. Ensure that each SWPPP
is thorough in its site evaluations and recommendations regarding existing or lacking BMPs.
Emphasis is also put on clearly conveying the regulatory basis and rational for the document, and
on its readability so that it will be a valuable resource for all facility staff members.