NPDES II Storm Water Erosion Control BMP Design and Construction Supervision
Client: Hanson Aggregates, Mid-Pacific Region
|
Location: Clayton and San Luis Obispo, California
|
Period of Performance: June - December 2004
|
Scope of Services: Clayton Quarry is an active open pit aggregate quarry on the north side
of Mt Diablo near Clayton, California. Due to on site activities and the exposure of materials to
storm water, TSS concentrations in runoff from the facility has been measured up to 90,000 mg/L.
To comply with NPDES II regulations, the client required implementation of engineered sediment
removal structures and source control BMPs in accordance with their SWPPP.
Clayton Quarry
Storm Water Detention Ponds: ADH Designed and supervised construction of two storm water
detention ponds to reduce TSS concentrations from storm water from the Primary Quarry (P1) and
the Exit Road (P3) with drainage areas of approximately 11 and 5 acres, respectively. The
detention ponds were designed in accordance with Caltrans BMP specifications to handle 10-year
24-hour storms with a detention time of 72-hours-for vector control. The actual constructed
detention ponds were less elaborate than the proposed design (shown below).
Erosion Control BMPs: Based upon onsite field assessments, ADH selected sediment erosion
control (BMP) features, determined optimal locations and supervised the installation of the
features along the facilities´ roadways, which included excelsior matting, fiber rolls,
water bars, and drainage rock fill used in drainage channels.
Results: TSS concentrations from a BMP postconstruction self-monitored storm event were as
follows:
- P1 was measured at 42 mg/L, reduced from as great as 84,000 mg/L
- P3 was measured at 1700 mg/L, reduced from as great as 48,000 mg/L
- Two locations along the facilities´ roadways were measured at 250 and 1300 mg/L, reduced
from as great as 74,000 and 27,000 mg/L, respectively.
Storm Water BMP Plan Review: ADH reviewed and revised Hanson's San Luis Obispo concrete facility's Augmented Stormwater BMPs Plan. The Plan addresses the potential impacts to surface water associated with the concrete ingredients as indicated by TSS, specific conductance, and pH.
Detention Pond Site Plan