|
ADH Client
|
Project Name
|
Status
|
Work Performed
|
|
URS Corporation
|
Industrial Stormwater Pollution Prevention Plan Investigation and Reporting for International
Aluminum
|
Ongoing since June 2007
|
- Review existing storm water-related document
- Facility inspections
- Evaluate current SWPPPs and BMPs
- Develop up-to-date SWPPPs for each facility
|
|
MACTEC
|
Caltrans District 7 Water Quality Volume Project
|
July 2009 - January 2010
|
- Used as-built specifications of the impervious area that existed before and after
December 1994
- Determined surface area and water quality volume for various highways in Los Angeles and
Ventura Counties
|
|
Cook Environmental Services, Inc.
|
Storm Water Pollution Prevention Plan - JM Enterprises, Inc.
|
October 2009
|
- Perform review of the Notice of Violation and Cleanup and Abatement Order issued to the
facility by the Regional Water Quality Control Board
- Conduct site inspection at each facility
- Evaluate the current SWPPP and BMPs
- Develop a relevant, up-to-date SWPPP which meets the Statewide NPDES General Permit's
requirements
- Assist in the installation of erosion control devices at the facility prior to the rainy
season
|
|
URS Corporation
|
Storm Water Environmental Compliance Audit - Port of San Francisco
|
August 2008
|
- Perform reviews of existing storm water-related documents for the facility
- Conduct site inspections at the facility
- Evaluate the current SWPPP and BMPs
- Complete a facility audit score sheet for pertinent state and federal regulations
|
|
California Department of Transportation
|
Caltrans Storm Water Quality Monitoring Program Maintenance Station Wash Racks Discharge Study
|
December 2006 - June 2007
|
- Water sample collection
- Monitor and document vehicle washing discharges
- Prepare extensive field documentation
- Manage transfer of samples to analytical laboratories
|
|
Kristar Enterprises
|
Dual Vortex Separator BMP Field Verification Testing
|
Completed May 2006
|
- Event Forecasting
- Flow Measurement
- BMP Influent and Effluent Sampling
- Field Documentation
- Reporting
|
|
Hanson Aggregates Mid-Pacific
|
Storm Water Polluton Prevention Plan Compliance San Luis Obispo Facility
|
Completed December 2004
|
|
|
Kinnetic Laboratories, Inc. as a contractor to Caltrans
|
Caltrans BMP Retrofit Pilot Study: Water Quality Monitoring Program in Districts 7 & 11,
Los Angeles and San Diego Counties, California
|
1998 to 1999
|
- Compile, process and prepare graphical representations of precipitation data from 23 BMP
Retrofit storm water monitoring stations located in the San Diego region that were monitored
during the 1998-1999 storm season.
|
For further details, please click on the menu items at top left.